Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Construct a simple and reliable helix

A solid start is the best way to build a trouble-free helix
Making sure the first level of a helix is as stable, secure, and smooth as possible makes the remaining levels go together easier.
Making sure the first level of a helix is as stable, secure, and smooth as possible makes the remaining levels go together easier.
A house, a car, and a layout all have something in common: they turn out better when they're built on a solid framework. This is especially true of a helix.

A helix - a spiral ramp meant to lift a model train from one level of a layout to another - may not be prototypical, but it's still important to build it well. Only if it starts out right at the bottom can the rest of it function smoothly and reliably.

My helix was designed to move HO scale trains between three layout levels. The lowest is the "basement" staging yard, only about 22 inches up from the floor. The next is the lower deck, which is about 38 inches off the floor. Finally, the upper deck is close to 56 inches high.
My helix was built on a 27" radius curve, which is broad enough for even my larger steam engines. A rise of 31/2" per loop gives it a 2.07 percent grade, which isn't too steep.

My goal was to build the approach and first level as carefully and strongly as possible, with a consistent curve radius and grade. If the helix were uncurled as a tangent track, the grade should follow a straight line with no significant dips or steep sections. When a small steam engine is struggling uphill with a near-capacity load, a consistent grade makes it easier for the train to reach the summit.

I use a specific method of building a helix and laying track, but there are many different ways to build them yourself, as well as at least one commercial helix kit on the market made by Easy-Helix (www.easyhelix.com). The principles presented here should work with most construction techniques.
Crunching the numbers
Any helix project should start with research. You need to know how much side clearance your largest equipment will need so you can determine minimum support spacing, roadbed width, and vertical separation. The vertical separation and curve radius determine the grade of the helix track, so all these details come together in the end.

I started by laying a piece of flextrack curved to a 24" radius on a piece of Homasote. I then marked the 5" estimated roadbed width on either side of the track centerline. I use ¾" wood as supports for each deck, so I know how much of the roadbed width will be taken up by the supports.

I had decided the clearance from deck to roof would be 3", more than enough for my 1920s-vintage rolling stock. Since I was using ½" plywood for the roadbed, this gave me a total of 3½" of rise per turn.
Fig. 1. A piece of flextrack curved to the 27" helix radius was used to verify clearances were sufficient for large engines, such as this Weyerhauser 2-8-8-2.
Fig. 1. A piece of flextrack curved to the 27" helix radius was used to verify clearances were sufficient for large engines, such as this Weyerhauser 2-8-8-2. The red marks are the outside edges of the roadbed.
Next, I tried my longest engines on the curve, as seen in fig. 1. I measured the overhang of both locomotive cabs and boilers and marked them on the Homasote. I also borrowed some larger engines, including a Southern Pacific 4-8-8-2 Cab Forward and a Southern Pacific 4-10-2, and checked them for clearance as well.

The longest articulated I own, a Weyerhaeuser 2-8-8-2, is a bit arthritic in its joints, so I decided the 24" radius would be tight. An SP 4-8-2 and 2-10-2 likewise worked, but both would run more easily on a larger radius.

I wanted absolute reliability in the helix - it's really tough to get in there and re-lay track or make any drastic changes after the fact - so I increased the radius to 27", even though that would end up taking more square footage. I re-laid the test track, re-marked the deck width, and checked my locomotive clearances again.

Expanding from a 24" radius to 27" meant the grade dropped from 2.32 percent to 2.07 percent. That's not much, but it may make a difference for smaller locomotives.
Fig. 2. Jeff’s helix started with a frame of inexpensive 1 x 4 lumber secured to the wall and supported by six 2 x 2 legs.
Fig. 2. Jeff’s helix started with a frame of inexpensive 1 x 4 lumber secured to the wall and supported by six 2 x 2 legs. It was carefully leveled side to side and front to back so the helix would start with a solid foundation.
From the ground up
The helix's foundation is a 5 x 5-foot framework of 1 x 4 lumber, with the outside front corners cut off at 45 degrees to take up less space. See Fig. 2. One side is screwed to the wall, and the rest is supported on six 2 x 2 legs with height-adjustable feet. I secured a temporary cross bar across the center to provide the pivot for a trammel I would use to mark my curves.
Fig. 3. Jeff used a trammel, affixed to a temporary pivot at the center of the helix, and a cardboard radius template to ensure the deck segments and track centerlines were lined up in a true circle.
For my roadbed, I chose furniture-grade plywood, which is more expensive but worth every penny, since it's flat, smooth, and strong. I laid it on the base and used a cardboard curve template and trammel, as seen in fig. 3, to ensure that the curve was indeed a perfect circle.

Next came 12 risers of ¼" plywood with ¾" square cleats, which I attached wherever the roadbed intersected the frame crossmembers. Some may view 12 risers as excessive, but they made the helix strong and solid. Nobody will be climbing on the layout, but the helix will be strong enough to support its own weight and to be moved without falling apart, if needed. The riser cleats were then screwed to the roadbed, but not yet secured to the frame.
Fig. 4. Jeff put shims under one end of a level to equal the desired amount of rise from one side of the helix to the other. When the far side of the helix showed as level, the grade was correct.
Fig. 4. Jeff put shims under one end of a level to equal the desired amount of rise from one side of the helix to the other. When the far side of the helix showed as level, the grade was correct. Different shims let him check the height all the way across the helix, or from one quarter-turn to another.
Making the grade
Next came the grade-setting process. My 4-foot-long carpenter's level didn't quite reach across the helix, so I clamped a piece of 1 x 6 to one end as an extension. Bridging the level directly across the center of the helix from the grade starting point to the half-turn point, I shimmed the end of the level on the low end - including the extension - to 13/4" with wood scraps and some thin balsa shims, as seen in fig. 4. This distance is half the 31/2" rise from one turn to the next. I lifted the roadbed opposite until it was level, and clamped the riser in place.

I then worked back to a point one-quarter of the way up the circle, which meant the shim had to be one-quarter of 31/2", or 7/8", and adjusted the riser and roadbed accordingly. From that quarter-turn point, I used the 13/4" shim to level halfway across the loop to the three-quarters-turn point.

During the leveling process, I frequently hunkered down and eyeballed the roadbed from the side. This gave me an immediate idea if there were any obvious or significant changes in grade from point to point.
Gaining altitude
I temporarily fitted the next roadbed segment and installed the 3" spacer blocks. I attached them with a bead of wood glue in the center of the block, plus two dabs of hot glue on the ends to hold them in place until the wood glue dried. Clamps held the blocks for a few minutes until the hot glue set.

With the next segment of roadbed clamped into place, I used the level to verify the elevation of the first section of the second level.

This process calls for some fiddling and adjustments, but I didn't rush it. Once the first circle of roadbed was in place, the rest of the helix went together easily and accurately.

After I'd established the elevations for the first roadbed loop and checked the levels twice or more, I screwed the risers into place. I also used a small torpedo level to make sure the roadbed was even side-to-side before securing the risers.
Fig. 5. Once the first turn of the helix was fixed in place, Jeff temporarily clamped the first segment of the second turn in place to check alignment.
Fig. 5. Once the first turn of the helix was fixed in place, Jeff temporarily clamped the first segment of the second turn in place to check alignment. He then laid the track on the first level and secured it with screws.
Adding the track
Next, I installed the first section of Atlas code 83 flextrack, which extended just past the point where the second-level roadbed overlapped the first. (See fig. 5.) It's important to lay the track now, as it's much more difficult to do when there's only 3" of clearance. I secured the track directly to the plywood with screws and washers, in case it needed to be adjusted before moving on to the next loop of the helix. (See "Screw-down track." - Ed.)

At this point, I ran a train up and down the loop to verify that all the track joints were trouble-free. This was the time to check, while the screws holding the track were accessible.

I coupled a smaller locomotive to a near-capacity cut of cars and watched closely as it slowly wound its way up the track. If the train changed speed, it would mean the grade wasn't consistent, and some riser-height adjustment would be in order. Patient inspection and cautious work at this stage pays off with consistent operation later.
Fig. 6. The track center line should line up with the level below it, so Jeff used a combination square to check it before securing the second deck.
Fig. 6. The track center line should line up with the level below it, so Jeff used a combination square to check it before securing the second deck.
With the track on the first level laid and securely attached, I permanently mounted the next segment of the baseboard. As shown in fig. 6, I used a combination square to keep the track centerlines aligned from one level to the next. Two 1" wide strips of ½" plywood bridge the deck joint. In some locations, the spacer blocks were aligned directly under the joint to secure the adjoining ends of the baseboard in place of the plywood strips.

Once the first level was secured and double-checked, I could begin construction on the rest of the helix in earnest. After that first level, the rest was relatively easy.

Keep these techniques in mind when starting your own helix, and it may end up as one of the most trouble-free parts of your layout.
No. 6 x 5/8" wood screws and no. 8 flat washers make an effective combination for securing flextrack directly to the plywood roadbed in areas where it can’t be seen.
No. 6 x 5/8" wood screws and no. 8 flat washers make an effective combination for securing flextrack directly to the plywood roadbed in areas where it can’t be seen.
Screw-down track
In a helix, it doesn't matter how the track looks, because it isn't a visible part of the layout. But since bulletproof operation is important, I wanted to be able to adjust the track during the construction process, so I opted for a slightly unusual system.

I secured the flextrack to the plywood using no. 6 x 5/8" flat head wood screws and no. 8 flat washers. The screw heads almost, but not completely, fit through the washers, so the screw head barely protrudes above the thickness of the washer.

The combined height of the washer and screw head, when tightened gently against the plastic ties, isn't enough to stick out above the railhead of code 83 track. Any locomotive pilot or coupler trip pin dragging severely enough to catch on these fasteners would already be causing trouble elsewhere on the layout.

The washers are small enough to allow some side-to-side fine tuning of the track location by loosening the screws.

Since the track wasn't laid on cork, I wasn't worried that the ties would compress into the roadbed and draw the rails too close together if the screws were snugged down a bit too much.

I've used these screw-type fasteners with great success.

Join the discussion

Read and share your comments on this article
Comment on this article
Want to leave a comment?
Only registered members of ModelRailroader.com are allowed to comment on this article. Registration is FREE and only takes a couple minutes.

Login or Register now.
0 comments
Great Scenery Tips

Great Scenery Tips

Realistic creeks and streams.

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!
By signing up you may also receive occasional reader surveys and special offers from Model Railroader magazine. Please view our privacy policy